WASTE TO WELLNESS : A WASTEWATER-POWERED BATHHOUSE

Navn
Wing Shan Yeung
Uddannelsesgrad
Kandidat
Fagfelt
Arkitektur
Institut
Arkitektur og Rum
Program
Architecture and Extreme Environments
År
2025

This project proposes the insertion of a new bathhouse into Aberdeen’s active wastewater treatment plant, reimagining industrial infrastructure as a regenerative system that gives back to the city. It utilizes the treated effluent water and recovers the waste heat from the plant, both typically discharged unused into the North Sea, and repurposes them as resources to power a civic leisure space and irrigate surrounding landscape and green roofs.

Elevated above the working plant, the linear bathhouse bridges across the different wastewater treatment stages. The spatial sequence of pools from hot baths, steam rooms, warm pools, and cold plunges, corresponds to the temperature zones of the treatment process below, from the neutral primary treatment to the heat-intensive sludge digestion areas. Waste becomes wellnessThe bathhouse becomes a public interface with hidden infrastructure: revealing, softening, and celebrating the unseen systems that sustain us. It is not merely an object inserted into the site, but an architectural bridge that links infrastructure with public life. A space that transforms taboo into resource and process into public life.

Site Context & Program

Aberdeen, the "oil capital of Europe," boomed after North Sea oil was discovered, becoming a global energy hub. This industrial expansion reshaped the city, transforming into an industrialized coastline. A one-month field trip in Aberdeen revealed a disconnected landscape prioritizing oil and gas, which lacks public access and social interaction.

These isolated industrial spaces raised questions about the potential coexistence of infrastructure and civic space. This led to research into Aberdeen's lost bathing culture, where public baths were once central to urban life but are now scarce, leaving a void in accessible, warm communal spaces.

This led me to consider reintroducing this ritual through infrastructure. Focusing on the Nigg Wastewater Treatment Works, I propose a bathhouse within the plant, reimagining industrial infrastructure as an elevated civic space. By reusing treated wastewater and waste heat to power thermal baths, the project aims to reintroduce public bathing and expand the current domain of wastewater treatment facilities.

1
/8
aa
5
55
555
1
rea
asdfa
asdf
Industrial Landscape
The Lost Bathing Culture
Guiding Principles

Thermal Water Quality in Treatment Stages Related to Specific Bathing Zones

Understanding the WWTW system is crucial. The plant's operational flow starts with influent, preliminary screening, and primary sedimentation via Lamella plates. Secondary treatment uses a two-stage BAFF system. Sludge digestion produces biogas for electricity, and all buildings have odour extraction. 

A thermal gradient across treatment stages becomes the foundation for program zoning, linking each stage's thermal quality to specific bath zones. The spatial experience mirrors the purification process, as water becomes cleaner and hotter, pools increase in temperature and elevation.

Program Mapping

Concept Development

1
/6
1
3
555
55
88
888
Treatment Stages
Thermal Gradient of WWTW Stages
Usable Space
Alignment of Thermal Zoning
Green Roofs: Views and Accessibility

The final proposal features a 130-meter long bathhouse that floats across four treatment buildings. The plan follows a linear path, anchored at the entrance by a concrete tower and the shell-and-tube heat exchange room, extending across the treatment plant, with two access points. 

The building's massing aligns with the treatment buildings, while sectional variations in height define distinct functional zones. Green roofs are integrated throughout, thematically aligned with bath zones: mist gardens over hot zones, meadows over cooler zones, and a pipe playground above the service building. 

Site Plan

On the second floor, visitors ascend to the changing rooms, initiating the bathing ritual. From there, a light-filled, timber-framed walkway, a linear procession, guides them through a sequence of pool zones with distinct temperatures and atmospheres. These zones mirror the thermal gradient of each wastewater treatment process below, layering sensory cues—mist, scent, heat, and sound to deepen the immersive experience.

Second Floor Plan
Section

The Spatial Journey

1
/6
a
3
5
7
8
7
The bathhouse is entered through this cylindrical tower, serving both as a structural core and vertical circulation. Its monolithic form ties back to the site’s industrial language. Elevated above operations, the bathhouse avoids odour zones, open up views while inviting the public into previously restricted infrastructure.
Upon entry, visitors are greeted by the waterfall of the entrance pond within this beautiful arrival space, here it is a moment of purification before beginning the elevated bathing journey.
The mirrored experience begins– in the neutral settling zone, with rest tubs, and immersion baths from 20–28°C. Here, the space is warm, grounded, and calm.
The hot aeration areas include sweat stones, hot baths, and saunas exceeding 36 degrees Celsius, with granite surfaces used to retain and radiate warmth. Operable doors connect this space to an adjacent green roof mist garden, irrigated using treated water.
The mist garden, irrigated by effluent water, serves as the outdoor terrace of the pool. Flowering through the seasons, it offers a multisensory bathing experience.
The final contrast — purity above, process below. A moment to reflect on the source of heat and water.

Prototype : Shell We Play

Thumbnail